Length of Pipe:
Feet
Cost Per Pipe:
Blue "A" Strut Units Entered:
0'
Feet and Inches:
0'0"
Number of Pipes needed to Create (65) Blue "A" Struts:
0
Number of Blue "A" Struts Produced From Each Uncut Pipe:
0
Waste for First 0 Pipes after Cutting 0 Struts Each:
0' = 0'0"
<-'
Number of Blue "A" Struts Created from the first 0 Pipes:
0
Number of Blue "A" Struts Created from the Last Pipe:
0
Waste on the Last Pipe after Cutting 0 Strut(s):
0'
<-'
Total Waste in Creating 65 Blue "A" Struts:
0'
Red "B" Strut Units Entered:
0'
Feet and Inches:
0'0"
Number of Pipes needed to Create (30) Red "B" Struts:
0
Number of Red "B" Struts Produced From Each Uncut Pipe:
0
Waste for First 0 Pipes after Cutting 0 Struts Each:
0' = 0'0"
<-'
Number of Red "B" Struts Created from the first 0 Pipes:
0
Number of Red "B" Struts Created from the Last Pipe:
0
Waste on the Last Pipe after Cutting 0 Strut(s):
0'
<-'
Total Waste in Creating 30 Red "B" Struts:
0'
Total Waste for All Struts:
0'
Number of Uncut Pipe/Materials Needed:
0
Total Cost of Materials @ $4.50 Each:
$
Weight Chart | 1" PVC Sch.40 | 1" PVC Sch.80 | 1.5" PVC Sch.40 | 2" PVC Sch.40 | 3/4" EMT | 1" EMT | 5/8" Iron Rebar #5 | 3/4" Iron Rebar #6 | 1/2" Basalt Rebar #4 | 5/8" Basalt Rebar #5 |
---|---|---|---|---|---|---|---|---|---|---|
Lbs Per Linear Ft | .32 | .41 | .51 | .68 | .435 | .64 | 1.043 | 1.502 | .237 | .46 |
65 Blue "A" Struts | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
30 Red "B" Struts | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total Weight of Struts (lbs) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Weight of Hubs, Rings, Zip Ties | 20.4 | 20.4 | 50.8 | 91.0 | 20.4 | 20.4 | 20.4 | 20.4 | 20.4 | 20.4 |
Total Dome Weight (lbs) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Blue "A" Chord Factor: .61803
Red "B" Chord Factor: .54653
--------------------------------------------
Altitude Xa | Decimal | 0' |
---|---|---|
Feet and Inches | 0' 0" |
A-A-A Triangle Edge |
Measurement | Strut Length |
Center Ring Hub Width |
Triangle Edge Total Length |
---|---|---|---|---|
A |
Decimal | 0' | 0' | 0' |
Feet and Inches | 0' 0" | 0" | 0' 0" |
Surface Area for Each A-A-A Triangle | 0 Square Feet |
---|
Altitude Xa | Decimal | 0' |
---|---|---|
Feet and Inches | 0' 0" |
Altitude Xb | Decimal | 0' |
---|---|---|
Feet and Inches | 0' 0" |
B-A-B Triangle Edge |
Measurement | Strut Length |
Center Ring Hub Width |
Triangle Edge Total Length |
---|---|---|---|---|
A |
Decimal | 0' | 0' | 0' |
Feet and Inches | 0' 0" | 0" | 0' 0" | |
B |
Decimal | 0' | 0' | 0' |
Feet and Inches | 0' 0" | 0" | 0' 0" |
Surface Area for Each B-A-B Triangle | 0 Square Feet |
---|
by johnhurt.com
Powered by Notepad++
Responsive Mobile Design
Alba gu bráth - Scotland Until Judgment
Should auld acquaintance be forgot,
And never brought to mind?
Should auld acquaintance be forgot,
And auld lang syne!
Chorus.-For auld lang syne, my dear,
For auld lang syne.
We'll tak a cup o' kindness yet,
For auld lang syne.
And surely ye'll be your pint stowp!
And surely I'll be mine!
And we'll tak a cup o'kindness yet,
For auld lang syne.
For auld, &c.
We twa hae run about the braes,
And pou'd the gowans fine;
But we've wander'd mony a weary fit,
Sin' auld lang syne.
For auld, &c.
We twa hae paidl'd in the burn,
Frae morning sun till dine;
But seas between us braid hae roar'd
Sin' auld lang syne.
For auld, &c.
And there's a hand, my trusty fere!
And gie's a hand o' thine!
And we'll tak a right gude-willie waught,
For auld lang syne.
For auld, &c.
Robert Burns - 1788